News Detail
Latest News
- Foster + Partners' Completes Long-Awaited Renovation of Transamerica Pyramid in San Fransisco, United States
- Gloria Jean’s Cafe
- Koohravan Villa
- ind-apex Innovation Center
- Heatherwick Studio Reimagines Seoul's Hanhwa Shopping Mall in South Korea
- Didar foodhall
- RSHP Wins Competition for Convention Center and Hotel Complex in Zhengzhou, China
- A Decade of Redefining Experience Retail: 15 Apple Stores Designed by Foster + Partners in City Centers
- Populous Unveils Design for a New Stadium for A.S. Roma in Italy
- Pomme garden
Amirdasht Tennis Court
Name: Amirdasht Tennis Court
Location: 7 st., Amirdasht Town, Kelarabad, Mazandaran, Iran
Architecture firm: Border of living Architecture and Construction Studio
Architects: Sasan Tavakoli, Shaghayegh Jami
Landscape: Alireza Salimpour
Date: Dec 2023 - March 2024
Site area: 1100 sqm
Built area: 751 sqm
Type: Sport facility
Structure: Saman Tavakoli
Electrical: Behnam Mohammadi
Lighting: Arend Lighting co.
Executive manager: Saman Tavakoli
Supervisor: Saman Tavakoli
3D: Mona Vahdati Manesh
Model: Mona Vahdati Manesh
Graphic: Afsane Houshmand Chayjani
Materials: Mammut sandwich panel
Photo: Mohammad Hassan Ettefagh
The design of the tennis court of Amirdasht town was on the agenda of the design team in order to respond to the need of being covered for the former tennis court of the town. A shed with an area of approximately 750 square meters and a height of 9 meters on the forest road of the town, the reality in this building was a massive metal structure in the heart of this forest, which should have distanced from this roughness in front of the observers eyes and also for its audiences which makes it possible to use the building for playing.
for this reason, a minimal and practical shell made of trapezoidal sheet of Mammoth Company was used to cover and excite the volume of the shed. A bright and double-sided shell with an exposed base that makes it possible to accelerate the construction process of the project. In the images of the diagram of the project, the formation of the shell form and its reasons are described.
References: